Meath Partnership, on behalf of the Department of Rural and Community Development and the Gaeltacht, is inviting Expressions of Interest from community and voluntary groups for outdoor recreation projects in Co. Meath under the Outdoor Recreation Infrastructure Scheme 2026/2027.

Meath Partnership is seeking proposals under:

    • Measure 1
    • Measure 2
    • Project Development Measure

The scheme supports the development of new outdoor recreation infrastructure and the repair, maintenance, enhancement and promotion of existing amenities in rural areas. Projects should provide benefits for local communities, improve opportunities to participate in outdoor recreation and, where possible, contribute to rural tourism and the local economy. 

Closing Date

Completed Expressions of Interest must be submitted to Meath Partnership by: Friday, 07th August 2026.

Expressions of Interest can be completed by clicking here.

The Scheme Outline is available to download below.

Funding Available

Funding of up to 90% of eligible project costs may be available. A minimum cash contribution of 10% must be provided by the successful applicant, community group or through philanthropic contributions. Other State funding cannot be used to meet the 10% matching-funding requirement. 

Measure 1 – Small-Scale Projects

Funding of up to €40,000 is available for small-scale repair, maintenance, development, promotion and marketing projects.

Eligible projects may include the development or improvement of trails, walkways, mountain access routes, cycleways, blueways and outdoor recreational facilities at bogs, rivers, lakes and beaches.

Measure 2 – Medium-Scale Projects

Funding of up to €200,000 is available for medium-scale projects, including:

    • New outdoor recreation infrastructure
    • Extensions or significant upgrades to existing trails and amenities
    • Walkways and mountain access routes
    • Cycleways and blueways
    • Water-based recreational infrastructure
    • Facilities located near bogs, rivers, lakes and beaches

Project Development Measure

The Project Development Measure supports projects that require further work before they are ready for a future Measure 1, Measure 2 or Measure 3 application.

Eligible activities may include:

    • Detailed design
    • Preparation for planning
    • Environmental and ecological assessments
    • Appropriate Assessment screening
    • Surveys and technical studies
    • Preparation for procurement

Examples of Eligible Projects

Projects may include:

    • Walking trails and looped walks
    • Cycling and water-based recreation infrastructure
    • Trail repairs and surface improvements
    • Accessibility improvements
    • Trail signage and visitor information
    • Picnic areas, seating and visitor facilities
    • Mountain access routes
    • Bridleways and equestrian trails
    • Biodiversity and climate-action measures
    • Visitor-management infrastructure
    • Improvements to amenities near rivers, lakes, bogs and other natural areas

Capital maintenance works such as path repair, fencing, trail furniture replacement, trailhead improvements and replacement signage are eligible. Routine operational activities such as vegetation control, strimming, litter collection, cleaning signs or clearing drains are not eligible.

ORIS focuses on outdoor recreation activities that take place in the natural environment. Sports grounds, traditional playgrounds, confined walking tracks, motorised activities and infrastructure primarily intended for commercial activities are not generally eligible.

Important Requirements

Applicants should ensure that:

    • The project has been developed in consultation with the local community, landowners and other relevant stakeholders.
    • The project aligns with the County Outdoor Recreation Plan and has been discussed with the County Outdoor Recreation Committee or relevant project team.
    • The proposal considers accessibility and universal design, particularly for people with disabilities and older people.
    • Biodiversity, climate action and the protection of the natural environment are incorporated into the project where appropriate.
    • Appropriate arrangements are in place for the future management and maintenance of the completed infrastructure.
    • The proposed recreational amenity will normally be freely accessible to the public.

Community engagement is a central requirement of the scheme, and evidence of consultation must be included in the application.

For applications under Measures 1 and 2, all necessary planning permissions, landowner consents and relevant environmental or ecological assessments must be in place before the final application is submitted. Projects that are not yet sufficiently developed may be more suitable for the Project Development Measure.

Application and Selection Process

Expressions of Interest will be assessed and prioritised by Meath Partnership through a competitive local selection process.

As the number of applications that Meath Partnership may submit to the Department is limited, submission of an Expression of Interest does not guarantee that a project will progress to the national funding stage.

Final project selection and funding decisions will be made by the Department of Rural and Community Development and the Gaeltacht.

For further information, queries or to obtain an Expression of Interest, please contact 046-9280790 or email leader@meathpartnership.ie

For further information on 3 of the scheme, please visit the Meath County Council website.

ORIS Scheme Outline 2026-2027

Download

View online